Timeline

Building milestones and the city events that shaped them, in one stream. Long-form stories live on their own index — one city event currently carries a linked narrative.

  1. Recorded by Buck among the buildings of 1795.

  2. c. 1800LeClair cabincompleted

    Recorded by Buck among the buildings of 1800.

  3. Recorded by Buck among the buildings of 1803.

  4. c. 1818Solomon Juneau arrives at the Milwaukee River fur postsettlement

    Juneau comes to the river mouth as an agent in the Astor-era fur trade; his post anchors what becomes Juneautown.

  5. c. 1822Solomon Juneau trading post and cabinconstruction start

    Juneau establishes trading post on the east bank.

  6. 1834Bigelow's saw millcompleted

    Recorded by Buck among the buildings of 1834.

  7. Recorded by Buck among the buildings of 1834.

  8. 1834White & Evans storecompleted

    Recorded by Buck among the buildings of 1834.

  9. Recorded by Buck among the buildings of 1834.

  10. Recorded by Buck among the buildings of 1835.

  11. Recorded by Buck among the buildings of 1835.

  12. Recorded by Buck among the buildings of 1835.

  13. Recorded by Buck among the buildings of 1835.

  14. Recorded by Buck among the buildings of 1835.

  15. Recorded by Buck among the buildings of 1835.

  16. Recorded by Buck among the buildings of 1835.

  17. 1835The Yellow Housecompleted

    Recorded by Buck among the buildings of 1835.

  18. Recorded by Buck among the buildings of 1835.

  19. Recorded by Buck among the buildings of 1835.

  20. Recorded by Buck among the buildings of 1835.

  21. 1835Cottage Inncompleted

    Jacques Vieau's 1.5-story "Triangle" — the second tavern in town.

  22. Recorded by Buck among the buildings of 1835.

  23. Recorded by Buck among the buildings of 1835.

  24. Recorded by Buck among the buildings of 1835.

  25. Recorded by Buck among the buildings of 1835.

  26. Recorded by Buck among the buildings of 1835.

  27. Recorded by Buck among the buildings of 1835.

  28. 1835Belle View Hotelcompleted

    Recorded by Buck among the buildings of 1835.

  29. 1835Juneautown and Kilbourntown platted; first public land salessettlement

    Rival plats east and west of the river, with deliberately misaligned street grids — the reason downtown bridges still cross at angles.

  30. Recorded by Buck among the buildings of 1835.

  31. Contract signed between Solomon Juneau and contractor Enoch G. Darling (specifications dated April 2); witnesses Geo. D. Dousman and Geo. S. Hosmer.

  32. Recorded by Buck among the buildings of 1836.

  33. 1836Jerry Noble housecompleted

    Recorded by Buck among the buildings of 1836.

  34. Recorded by Buck among the buildings of 1836.

  35. 1836F. Burns housecompleted

    Recorded by Buck among the buildings of 1836.

  36. 1836John Furlong housecompleted

    Recorded by Buck among the buildings of 1836.

  37. Recorded by Buck among the buildings of 1836.

  38. Recorded by Buck among the buildings of 1836.

  39. 1836Thomas Hughes housecompleted

    Recorded by Buck among the buildings of 1836.

  40. Recorded by Buck among the buildings of 1836.

  41. Recorded by Buck among the buildings of 1836.

  42. Recorded by Buck among the buildings of 1836.

  43. Recorded by Buck among the buildings of 1836.

  44. Recorded by Buck among the buildings of 1836.

  45. 1836McCausliffe housecompleted

    Recorded by Buck among the buildings of 1836.

  46. Recorded by Buck among the buildings of 1836.

  47. Recorded by Buck among the buildings of 1836.

  48. 1836George Abert housecompleted

    Recorded by Buck among the buildings of 1836.

  49. Recorded by Buck among the buildings of 1836.

  50. Recorded by Buck among the buildings of 1836.

  51. Recorded by Buck among the buildings of 1836.

  52. Recorded by Buck among the buildings of 1836.

  53. Recorded by Buck among the buildings of 1836.

  54. Recorded by Buck among the buildings of 1836.

  55. Recorded by Buck among the buildings of 1836.

  56. Recorded by Buck among the buildings of 1836.

  57. Burned Dec. 6, 1836.

  58. 1836Peter Juneau housecompleted

    Recorded by Buck among the buildings of 1836.

  59. Recorded by Buck among the buildings of 1836.

  60. Recorded by Buck among the buildings of 1836.

  61. Recorded by Buck among the buildings of 1836.

  62. Recorded by Buck among the buildings of 1836.

  63. 1836A. W. Hatch housecompleted

    Recorded by Buck among the buildings of 1836.

  64. Recorded by Buck among the buildings of 1836.

  65. 1836George Bowman housecompleted

    Recorded by Buck among the buildings of 1836.

  66. Recorded by Buck among the buildings of 1836.

  67. Recorded by Buck among the buildings of 1836.

  68. Recorded by Buck among the buildings of 1836.

  69. 1836James McNeil housecompleted

    Recorded by Buck among the buildings of 1836.

  70. Recorded by Buck among the buildings of 1836.

  71. 1836Curtis Reed housecompleted

    Recorded by Buck among the buildings of 1836.

  72. Recorded by Buck among the buildings of 1836.

  73. 1836Joseph Keyes housecompleted

    Recorded by Buck among the buildings of 1836.

  74. Pulled down 1836.

  75. Recorded by Buck among the buildings of 1836.

  76. Recorded by Buck among the buildings of 1836.

  77. Recorded by Buck among the buildings of 1836.

  78. Recorded by Buck among the buildings of 1836.

  79. Recorded by Buck among the buildings of 1836.

  80. Recorded by Buck among the buildings of 1836.

  81. 1836U.S. Land Officecompleted

    Recorded by Buck among the buildings of 1836.

  82. Recorded by Buck among the buildings of 1836.

  83. Recorded by Buck among the buildings of 1836.

  84. Recorded by Buck among the buildings of 1836.

  85. Recorded by Buck among the buildings of 1836.

  86. Recorded by Buck among the buildings of 1836.

  87. Recorded by Buck among the buildings of 1836.

  88. Recorded by Buck among the buildings of 1836.

  89. Recorded by Buck among the buildings of 1836.

  90. Recorded by Buck among the buildings of 1836.

  91. Recorded by Buck among the buildings of 1836.

  92. Recorded by Buck among the buildings of 1836.

  93. Recorded by Buck among the buildings of 1836.

  94. 1836G. Cady's tin shopcompleted

    Recorded by Buck among the buildings of 1836.

  95. Recorded by Buck among the buildings of 1836.

  96. Recorded by Buck among the buildings of 1836.

  97. Recorded by Buck among the buildings of 1836.

  98. Recorded by Buck among the buildings of 1836.

  99. Recorded by Buck among the buildings of 1836.

  100. Recorded by Buck among the buildings of 1836.

  101. Recorded by Buck among the buildings of 1836.

  102. Recorded by Buck among the buildings of 1836.

  103. 1836Wm. Brown storecompleted

    Recorded by Buck among the buildings of 1836.

  104. Recorded by Buck among the buildings of 1836.

  105. Recorded by Buck among the buildings of 1836.

  106. 1836Higby's drug storecompleted

    Recorded by Buck among the buildings of 1836.

  107. Recorded by Buck among the buildings of 1836.

  108. Recorded by Buck among the buildings of 1836.

  109. Recorded by Buck among the buildings of 1836.

  110. Recorded by Buck among the buildings of 1836.

  111. Recorded by Buck among the buildings of 1836.

  112. 1836Balser's bakerycompleted

    Recorded by Buck among the buildings of 1836.

  113. Recorded by Buck among the buildings of 1836.

  114. Recorded by Buck among the buildings of 1836.

  115. Recorded by Buck among the buildings of 1836.

  116. Recorded by Buck among the buildings of 1836.

  117. Recorded by Buck among the buildings of 1836.

  118. 1836J. Rowell's shopcompleted

    Recorded by Buck among the buildings of 1836.

  119. Recorded by Buck among the buildings of 1836.

  120. 1836Geo. Peter's salooncompleted

    Recorded by Buck among the buildings of 1836.

  121. Recorded by Buck among the buildings of 1836.

  122. Recorded by Buck among the buildings of 1836.

  123. Recorded by Buck among the buildings of 1836.

  124. Recorded by Buck among the buildings of 1836.

  125. Recorded by Buck among the buildings of 1836.

  126. Recorded by Buck among the buildings of 1836.

  127. Recorded by Buck among the buildings of 1836.

  128. Recorded by Buck among the buildings of 1836.

  129. Recorded by Buck among the buildings of 1836.

  130. Recorded by Buck among the buildings of 1836.

  131. Recorded by Buck among the buildings of 1836.

  132. Recorded by Buck among the buildings of 1836.

  133. Recorded by Buck among the buildings of 1836.

  134. The first South Side school was kept in it, winter 1836 (teacher Eli Bates, Jr.); still standing 1889.

  135. Recorded by Buck among the buildings of 1836.

  136. 1836(Elah) Dibble housecompleted

    Recorded by Buck among the buildings of 1836.

  137. Recorded by Buck among the buildings of 1836.

  138. Removed when East Water was filled in 1836 to the corner of East Water & Wisconsin.

  139. 1836Chas. Hart millcompleted

    Recorded by Buck among the buildings of 1836.

  140. 1836Ross & Clyman millcompleted

    Recorded by Buck among the buildings of 1836.

  141. Recorded by Buck among the buildings of 1836.

  142. Recorded by Buck among the buildings of 1836.

  143. Recorded by Buck among the buildings of 1836.

  144. Recorded by Buck among the buildings of 1836.

  145. Recorded by Buck among the buildings of 1836.

  146. Recorded by Buck among the buildings of 1836.

  147. Recorded by Buck among the buildings of 1836.

  148. Recorded by Buck among the buildings of 1836.

  149. Recorded by Buck among the buildings of 1836.

  150. Recorded by Buck among the buildings of 1836.

  151. Recorded by Buck among the buildings of 1836.

  152. Completed per the printed contract deadline ("15th of August next, 1836"); built by Juneau & Martin and presented free to the county with the square and lots.

  153. Recorded by Buck among the buildings of 1837.

  154. Recorded by Buck among the buildings of 1837.

  155. 1837John Julien housecompleted

    Recorded by Buck among the buildings of 1837.

  156. Recorded by Buck among the buildings of 1837.

  157. Recorded by Buck among the buildings of 1837.

  158. 1837Henry Bleyer housecompleted

    Recorded by Buck among the buildings of 1837.

  159. 1837John Furlong housecompleted

    Recorded by Buck among the buildings of 1837.

  160. Recorded by Buck among the buildings of 1837.

  161. Recorded by Buck among the buildings of 1837.

  162. Recorded by Buck among the buildings of 1837.

  163. Recorded by Buck among the buildings of 1837.

  164. Recorded by Buck among the buildings of 1837.

  165. Recorded by Buck among the buildings of 1837.

  166. Commenced 1836, completed & occupied summer 1837; kept by Silas Griffith and successors. Later the Republican House.

  167. First occupants of the jail, Scott & Bennett (January 1837), escaped April 1837.

  168. Recorded by Buck among the buildings of 1837.

  169. Recorded by Buck among the buildings of 1837.

  170. 1837Andrew Vieau storecompleted

    Recorded by Buck among the buildings of 1837.

  171. Recorded by Buck among the buildings of 1838.

  172. Became David Merrill's hotel at the NW corner of Ferry & South Water, 1838-41; then kept by Geo. P. Golden ~3 years.

  173. Recorded by Buck among the buildings of 1838.

  174. Recorded by Buck among the buildings of 1838.

  175. Recorded by Buck among the buildings of 1838.

  176. Recorded by Buck among the buildings of 1838.

  177. Removed to the Point in '38 and occupied by J. & L. Childs as a hotel, SW corner Ferry & South Water.

  178. Undermined by the lake; removed ~1838 up town and placed on East Water just north of the Cottage Inn, used as a store.

  179. Recorded by Buck among the buildings of 1838.

  180. Recorded by Buck among the buildings of 1838.

  181. Recorded by Buck among the buildings of 1838.

  182. Recorded by Buck among the buildings of 1838.

  183. Recorded by Buck among the buildings of 1838.

  184. Recorded by Buck among the buildings of 1838.

  185. Recorded by Buck among the buildings of 1838.

  186. Begun 1834/35, not completed until 1838.

  187. Recorded by Buck among the buildings of 1838.

  188. Recorded by Buck among the buildings of 1838.

  189. Recorded by Buck among the buildings of 1838.

  190. Recorded by Buck among the buildings of 1838.

  191. Recorded by Buck among the buildings of 1838.

  192. Recorded by Buck among the buildings of 1839.

  193. 1839Engine house (1839)completed

    Recorded by Buck among the buildings of 1839.

  194. First Catholic church in Milwaukee dedicated.

  195. Recorded by Buck among the buildings of 1839.

  196. Removed 1839 across the bay to the site of the Minerva Furnace.

  197. Recorded by Buck among the buildings of 1840.

  198. Recorded by Buck among the buildings of 1840.

  199. Recorded by Buck among the buildings of 1840.

  200. Recorded by Buck among the buildings of 1840.

  201. Purchased 1840 by Dr. L. W. Weeks, put on a scow, brought upriver and re-sited just south of E. H. Brodhead's.

  202. Recorded by Buck among the buildings of 1840.

  203. Recorded by Buck among the buildings of 1840.

  204. Recorded by Buck among the buildings of 1840.

  205. Recorded by Buck among the buildings of 1840.

  206. 1840First brewerycompleted

    Recorded by Buck among the buildings of 1840.

  207. c. 1841Daniel H. Richards Housecompleted

    Built between 1836 and 1841, most likely after Richards's 1841 land purchase.

  208. 1841Cottage Innaltered

    Enlarged by H. N. Wells: two-story rear extension, one story in front (carpenter Lawrence Robbins, mason Wm. Payne).

  209. 1841First Presbyterian Churchconstruction start

    Commenced summer 1841; basement occupied that autumn.

  210. Recorded by Buck among the buildings of 1841.

  211. Recorded by Buck among the buildings of 1841.

  212. Recorded by Buck among the buildings of 1841.

  213. Recorded by Buck among the buildings of 1841.

  214. Recorded by Buck among the buildings of 1842.

  215. Recorded by Buck among the buildings of 1842.

  216. Recorded by Buck among the buildings of 1842.

  217. Recorded by Buck among the buildings of 1842.

  218. Became the Juneau House hotel (S. R. Bradley, 1842); later the first Tremont House.

  219. Recorded by Buck among the buildings of 1842.

  220. Recorded by Buck among the buildings of 1842.

  221. 1842First tannerycompleted

    Recorded by Buck among the buildings of 1842.

  222. Recorded by Buck among the buildings of 1842.

  223. Recorded by Buck among the buildings of 1842.

  224. 1842Wells' Blockcompleted

    Recorded by Buck among the buildings of 1842.

  225. Recorded by Buck among the buildings of 1842.

  226. 1842L. J. Farwell housecompleted

    Recorded by Buck among the buildings of 1842.

  227. 1842Hiram Mabbet housecompleted

    Recorded by Buck among the buildings of 1842.

  228. Recorded by Buck among the buildings of 1842.

  229. Recorded by Buck among the buildings of 1842.

  230. Recorded by Buck among the buildings of 1842.

  231. Recorded by Buck among the buildings of 1843.

  232. Recorded by Buck among the buildings of 1843.

  233. Recorded by Buck among the buildings of 1843.

  234. Recorded by Buck among the buildings of 1843.

  235. Recorded by Buck among the buildings of 1843.

  236. Recorded by Buck among the buildings of 1843.

  237. Recorded by Buck among the buildings of 1843.

  238. Recorded by Buck among the buildings of 1843.

  239. 1843Hale's binderycompleted

    Recorded by Buck among the buildings of 1843.

  240. Recorded by Buck among the buildings of 1843.

  241. Recorded by Buck among the buildings of 1843.

  242. 1843Plymouth Churchconstruction start

    Cornerstone laid by Rev. J. J. Miter.

  243. Destroyed by fire November 19, 1843 while under construction.

  244. Recorded by Buck among the buildings of 1843.

  245. 1843Cottage Innaltered

    "The old frontier building known as the Cottage Inn has disappeared, and a large four-story building has appeared in its place" (the Harriman House).

  246. Recorded by Buck among the buildings of 1843.

  247. 1844Plymouth Churchcompleted

    Dedicated January 1, 1844.

  248. Benjamin Church completes his residence in Kilbourntown.

  249. Auditorium finished summer 1843; dedicated January 24, 1844, with the installation of Rev. A. L. Chapin.

  250. Recorded by Buck among the buildings of 1844.

  251. Recorded by Buck among the buildings of 1844.

  252. Recorded by Buck among the buildings of 1844.

  253. Recorded by Buck among the buildings of 1844.

  254. Recorded by Buck among the buildings of 1844.

  255. 1844Ludington storecompleted

    Recorded by Buck among the buildings of 1844.

  256. Recorded by Buck among the buildings of 1844.

  257. 1844Williams Lee storecompleted

    Recorded by Buck among the buildings of 1844.

  258. Recorded by Buck among the buildings of 1844.

  259. Recorded by Buck among the buildings of 1844.

  260. Recorded by Buck among the buildings of 1844.

  261. Recorded by Buck among the buildings of 1844.

  262. Recorded by Buck among the buildings of 1844.

  263. Recorded by Buck among the buildings of 1844.

  264. Recorded by Buck among the buildings of 1844.

  265. Began grinding September 30, 1844.

  266. Set afire January 16, 1844 while building.

  267. Recorded by Buck among the buildings of 1844.

  268. Recorded by Buck among the buildings of 1844.

  269. Pulled down about 1844 for the advance guard of the Axtell House.

  270. Burned with Juneau's house in the Great Fire of April 7, 1845.

  271. East-side (Juneautown) retaliation: the east half of the Spring Street bridge was sunk and the Menomonee River bridge near Walker's Point destroyed.

  272. Destroyed in the Great Fire of April 7, 1845.

  273. Destroyed in the Great Fire of April 7, 1845.

  274. Destroyed in the Great Fire of April 7, 1845.

  275. Destroyed in the Great Fire of April 7, 1845.

  276. 1845Reed warehousecompleted

    Recorded by Buck among the buildings of 1845.

  277. 1845United States Hotelcompleted

    Formally opened November 1, 1845.

  278. 1845Wells' Blockfire

    Destroyed in the Great Fire of April 7, 1845.

  279. Destroyed in the Great Fire of April 7, 1845.

  280. Recorded by Buck among the buildings of 1845.

  281. Destroyed in the Great Fire of April 7, 1845.

  282. Buck's Great Fire loss list includes the Tremont House — the old 1835 Juneau house.

  283. 1845Military Hallcompleted

    Recorded by Buck among the buildings of 1845.

  284. Destroyed in the Great Fire of April 7, 1845.

  285. Destroyed in the Great Fire of April 7, 1845.

  286. Destroyed in the Great Fire of April 7, 1845.

  287. Destroyed in the Great Fire of April 7, 1845.

  288. Destroyed in the Great Fire of April 7, 1845.

  289. Destroyed in the Great Fire of April 7, 1845.

  290. Delcampo's Exchange was destroyed in the Great Fire of April 7, 1845.

  291. Recorded by Buck among the buildings of 1845.

  292. 1845Cottage Innfire

    Destroyed in the Great Fire of April 7, 1845.

  293. A schooner struck and damaged the Spring/Wisconsin Street bridge, the spark that led to the Bridge War.

  294. A west-side (Kilbourntown) mob tore down the west half of the Chestnut Street bridge and damaged the Oneida/Wells Street bridge.

  295. Destroyed in the Great Fire of April 7, 1845.

  296. Destroyed in the Great Fire of April 7, 1845.

  297. Destroyed in the Great Fire of April 7, 1845.

  298. Destroyed in the Great Fire of April 7, 1845.

  299. Destroyed in the Great Fire of April 7, 1845.

  300. Destroyed in the Great Fire of April 7, 1845.

  301. Destroyed in the Great Fire of April 7, 1845.

  302. Destroyed in the Great Fire of April 7, 1845.

  303. 1845The Great Fire of April 7, 1845disaster

    Started ~4 a.m. in a small wooden building on East Water opposite the Cottage Inn and burned two entire squares (Water to Main/Broadway, Michigan to Huron): upwards of thirty buildings, ~$90,000 loss, $33,500 insured. Buck itemizes the losses, including the Tremont House (the old 1835 Juneau house), the Cottage Inn, Delcampo's Exchange, and Wells' block. One footnote gives April 11. "Before the close of navigation the whole burned district was covered with larger and more costly buildings" — the reason so few pre-1845 East Water buildings survived.

  304. 1845The Bridge Warcivic

    Kilbourntown partisans wreck the Spring Street bridge; weeks of skirmishing between east and west sides force the consolidation compromise that produces the unified city the following year.

  305. Destroyed in the Great Fire of April 7, 1845.

  306. Destroyed in the Great Fire of April 7, 1845.

  307. Destroyed in the Great Fire of April 7, 1845.

  308. Destroyed in the Great Fire of April 7, 1845.

  309. 1845Putnam warehousecompleted

    Recorded by Buck among the buildings of 1845.

  310. Destroyed in the Great Fire of April 7, 1845.

  311. Recorded by Buck among the buildings of 1846.

  312. 1846Empire Millconstruction start

    Commenced April 1846.

  313. Enlarged 1846.

  314. 1846City of Milwaukee incorporated; Juneau first mayorcivic

    The three settlements unite under a city charter, January 31, 1846.

  315. Fourth story and dome added by new owner Ira Couch of Chicago (purchase January 1846, $17,875).

  316. The Bridge War crisis directly powered the charter unifying Juneautown, Kilbourntown, and Walker's Point into the City of Milwaukee; a February 1846 referendum funded bridge reconstruction on all sides.

  317. 1846Old St. Mary's Churchconstruction start
  318. Lengthened 17 feet and a basement built for a school under Bishop John M. Henni; regular services discontinued after St. Mary's was erected.

  319. Recorded by Buck among the buildings of 1846.

  320. Recorded by Buck among the buildings of 1846.

  321. Recorded by Buck among the buildings of 1846.

  322. 1847Empire Millopened

    Opened July 1, 1847.

  323. Lengthened 20 feet, $1,000.

  324. Cornerstone laid on the second Sunday of Advent by Bishop John Martin Henni, assisted by Very Rev. Martin Kundig V.G., Rev. Peter McLaughlin and Rev. Michael Heis; deposited: the name of Pope Pius IX and the year of American Independence.

  325. 1848Sweet's Elevatorcompleted

    First steam grain elevator in the city.

  326. c. 1848German immigration wave acceleratessettlement

    Post-1848 arrivals make Milwaukee the "German Athens of America"; German capital, craftsmen, and congregations drive the cream city brick building boom.

  327. 1848Sweet's Elevatorconstruction start

    Commenced spring 1848; the frame was raised in 30 days without accident.

  328. 1849Martin Blockcompleted

    "The finest building in the city" at its erection.

  329. The Bell View wing (built 1835-37) sold to Andrew McCormick and moved to the NE corner of Main & Detroit Sts., refitted as the Keystone State hotel; later moved again by John Meinecke to the NW corner of Detroit & Milwaukee Sts.

  330. Sold 1849 to the Kanes.

  331. c. 1849Belle View Hoteldemolished

    Removed ~1849 for a business block; a part survived in the Badger State Hotel, Third Ward.

  332. Burned Jan. 25, 1850.

  333. In use to 1850; sold to Daniel Waite for $100.

  334. 1840s-1850s core.

  335. 1851Milwaukee Gas Worksconstruction start

    City contract with John Lockwood, June 6, 1851; company chartered January 3, 1852.

  336. Homestead core; reached present form late 1860s-early 1870s.

  337. Burned Nov. 9, 1851.

  338. Removed 1851 to 527 East Water as a hay barn, then to River St. as a flouring mill.

  339. 40 x 80 transept added, $3,000 — "the steamboat church".

  340. Sold 1852 for $400 to the Summerfield Methodists.

  341. $1,400 improvement on Lot 16 (tax rolls).

  342. Moved to Jackson St. (Nos. 528-530), then to Van Buren.

  343. Gas first let on; formal opening banquet at Young's Hall, November 6, 1852.

  344. Explosion blew out one side of the building.

  345. Burned Oct. 16, 1853.

  346. Cathedral consecrated for the Diocese of Milwaukee.

  347. Burned Oct. 16, 1853.

  348. Present structure; the first Gipfel brewery building on the site was erected 1843.

  349. Burned from its Huron Street stable, August 1854.

  350. Rugee's Spring Street bridge fully complete.

  351. John Rugee's rebuilt Spring Street bridge opened to traffic.

  352. Burned Aug. 24, 1854.

  353. Burned Aug. 17, 1854.

  354. 1854Nazro Buildingcompleted

    Nazro's block "soon eclipsed the finest stores on the street".

  355. c. 1854Villa Uhrigcompleted

    One of the earliest extant Italianate buildings in Milwaukee.

  356. Burned August 17, 1854.

  357. Original North Point Light tower first lit: 28-ft Cream City brick tower, 4th-order Fresnel lens by Barbier, Bénard & Turenne.

  358. Main part of the old Milwaukee House burned; last occupants Theodore Wetstein and F. Jacoby (per the Buck plate catalog caption; not fully reconciled against the 1849 grading/removal account also recorded for this building).

  359. c. 1855Isaac Leister Housecompleted

    A log house probably preceded it on the site.

  360. 1855sOctagon Housecompleted

    No conclusive dating; likely built elsewhere in the 1850s-60s.

  361. Tax rolls 1853-1876; Italianate country estate on the Kilbourn Road.

  362. Brewery founded 1856 by George Schweickhart.

  363. 1856Newhall Houseconstruction start

    Martin & Rugee begin carpentry; the house was enclosed and plastered in the winter of 1856.

  364. 1856Solomon Juneau diespersonal

    Juneau dies at Theresa, Wisconsin, the inland town he founded after leaving Milwaukee.

  365. Removed 1856 to 484 Astor St.

  366. building removed 1856 to Van Buren st. — the "Home for the Friendless," Nos. 378–380 Van Buren

  367. Cemetery consecrated by Archbishop John M. Henni (initial 55 acres).

  368. 1857Mitchell Bank Building (1858)construction start

    Old bank building on the corner demolished; the bank moved temporarily into the Albany Block corner rooms.

  369. 1857Newhall Houseopened

    Grand opening under lessees Kean & Rice; "largest and finest hotel in the West".

  370. 1857Albany Blockcompleted

    Completed January 1857 (Sentinel sketch of Jan. 19, 1857 reprinted whole by Buck).

  371. First occupied January 22, 1858.

  372. 1858Albany Blockexpanded

    James S. Brown addition (commenced fall 1857): three stories, 40 x 120, oval rotunda 74 x 38 x 35 with dome skylight and thirteen niches of Grecian casts; billiard hall 118 x 39.

  373. 1860Iron Blockfire

    Site cleared by the great fire of March 20, 1860, which destroyed the predecessor Eldred frame buildings (Nos. 398-400 East Water, built 1836) and the whole row to the Broadway corner. (Buck's vol.-4 aggregate elsewhere calls this "the February 1860 fire" — internal date discrepancy noted.)

  374. 1860Empire Millfire

    Fire consumed the two upper stories (stock loss $12,000-15,000; mill valued $70,000, insured $38,000); the owners rebuilt.

  375. Built c. 1857-64; Kubbernuss bought the 3-acre tract July 17, 1864 for $600.

  376. 1860Iron Blockconstruction start

    Iron facade components shipped from New York.

  377. 1860Lady Elgin disasterdisaster

    The steamer Lady Elgin sinks in Lake Michigan; roughly 300 lost, devastating the Irish Third Ward — reshaping the ward's community and politics.

  378. 1860The Great Fire of March 20, 1860disaster

    Consumed the row at East Water & Wisconsin and the corner on Broadway, destroying the 1836 Eldred frame buildings and clearing the site on which James B. Martin built the Iron Block. Buck's vol.-4 aggregate elsewhere calls it "the February 1860 fire" (22 buildings burned) — internal date discrepancy noted; March 20 follows his Iron Block site history.

  379. Burned July 4, 1861.

  380. Burned July 4, 1861.

  381. 1861Iron Blockcompleted
  382. Stone date plaque in the gable.

  383. Burned ~1865.

  384. Remodeling directed by Victor Schulte.

  385. Church built 1867-68.

  386. First improvements valued $2,000 in the 1869 tax rolls.

  387. Earliest surviving portion of the Bavaria Brewery complex.

  388. 1870Juneau Parkrenamed

    7th Ward residents voted to rename the park for Solomon Juneau (previously "7th Ward Park"), the same year Horace W. S. Cleveland was commissioned to formalize its design.

  389. c. 1870Burnham-Zube Housealtered

    Cream brick veneer "modernization" and reorientation to National Avenue, c. 1869-70s.

  390. Italianate remodeling and three-story east wing under George C. White.

  391. Cleared for the second county courthouse.

  392. 1871James S. Peck Housecompleted
  393. c. 1871First county buildingsdemolished

    All pulled down 1870-71 for the present (second) courthouse.

  394. c. 1871Villa Uhrigexpanded

    Side wings attributed to Leonard Schmidtner.

  395. Milwaukee Sentinel notices, November 3, 1871.

  396. c. 1872Milo P. Jewett Housecompleted
  397. Pulled down 1872 and rebuilt.

  398. Assessment jump to $1,000 in the Town of Lake tax rolls marks completion.

  399. 1873Panic of 1873 pauses the building boomeconomic

    The national panic freezes construction credit; Mitchell's bank stays open and anchors the recovery that produces the Mitchell and Mackie buildings.

  400. Second courthouse opens on the square.

  401. 175-ft standpipe tower for the Milwaukee Water Works.

  402. Built at a cost of about $20,000.

  403. Apse added 1873-74; limestone parish house (John A. Moller) followed 1899.

  404. 1875Plankinton Houseexpanded

    Arcade addition erected: Nos. 169-177 West Water St., 100 ft. frontage, master mason Hiram R. Bond.

  405. c. 1875Burnham-Zube Housemoved

    Moved about 100 feet east onto Frederick Zube's lot between 1874 and 1876.

  406. 1875James McNeil housedemolished

    Scene of the 1837 gambler attack; removed 1875.

  407. 1875sThe Yellow Housedemolished

    Disappeared in the 1870s.

  408. 1875Mathew Stein gun shopdemolished

    Removed 1875 for Nunnemacher's block.

  409. Taken down 1876.

  410. House repaired after an 1877 fire.

  411. second brick building erected in Milwaukee; bricks made on the spot by Finch — the first true brick yard in Milwaukee (he was disgusted the bricks weren't red — Milwaukee cream brick); pulled down 187

  412. In use till 1878 (site of the Milwaukee mill).

  413. 1878Mitchell Buildingcompleted
  414. Moved across the street when elevator B was built.

  415. 1878Trinity Lutheran Church Complexconstruction start

    Cornerstone laid before an estimated 1,000 people.

  416. Razed for the present Mitchell (bank) Building per Buck; the Mitchell Building is dated 1876-78 — discrepancy noted.

  417. $3,500 improvement in the 1879 tax rolls.

  418. 1879Plankinton Houseexpanded

    Birchard block (85 ft. on Grand Ave., 100 ft. on West Water St.) annexed under lease and remodeled to conform externally with the completed hotel.

  419. Twin of the George Knowles Jr. House next door.

  420. Milwaukee News Building (#222), per tax rolls 1877-1879 and date stone.

  421. 1879Albany Blockdemolished

    Cleared for Mitchell's Chamber of Commerce (the Mackie Building, 1879-80).

  422. The Crains' "honeymoon house" completed after their September 1879 wedding.

  423. Believed the largest and most elaborate Lutheran church building in North America at completion.

  424. 1880Mackie Buildingcompleted

    Grain Exchange trading room opens.

  425. 1881Martin Blockdemolished

    Pulled down 1881; succeeded by Max Mack's $130,000 Mack Block.

  426. Sold to the Wisconsin Central RR for $33,000.

  427. Burned August 10, 1882 as the River St. flouring mill.

  428. 1882Pryor Avenue Iron Wellconstruction start

    Drilling began October 1882; final 1,500-ft depth reached early 1883.

  429. Built and first occupied by mason Charles H. Busse.

  430. Purchased by Frederick Layton for $32,000.

  431. Durner Building (#2002) built or remodeled to present appearance.

  432. System complete by 1888.

  433. Built summer 1883, finished by October.

  434. Moved again 1883 to the NE corner of Lyon & Jefferson.

  435. c. 1883Lorenz Paetzold Housecompleted

    Paetzold listed at the address by 1883 (parcel bought 1878).

  436. 1883Lamers Blockcompleted

    Final cost $6,000 ($5,000 mortgage taken 1882).

  437. Occupied January 1883.

  438. The fatal Newhall House fire; the coroner's-jury findings are reprinted by Buck. Site sold to Northwestern Mutual Life for $90,000.

  439. 1883Newhall House firedisaster

    January 10, 1883: the six-story Newhall House hotel burns with roughly 70+ dead — among the deadliest hotel fires in United States history. Buck reprints the coroner's-jury findings. The disaster reshaped hotel fire-safety expectations in the city; Northwestern Mutual Life bought the site for $90,000.

  440. Milwaukee Sentinel, Jan. 1, 1883; Evening Wisconsin, Mar. 8, 1883.

  441. Samuel Howard Building (#216), per tax rolls 1883-84; James Douglas, architect.

  442. 1884Plankinton Houseexpanded

    Old Nos. 119, 121 and 123 Grand Ave. (the 1847/post-1861 Plankinton stores) pulled down with the adjoining vacated alley, adding 70 ft. of frontage for that year's hotel extension.

  443. Original Fifteenth District School block.

  444. First assessed 1884 ($600), completed by 1885 ($1,300).

  445. 1886Bay View tragedylabor

    State militia fire on eight-hour-day marchers at the Bay View rolling mill; seven die. A watershed for Milwaukee labor and later Socialist city government.

  446. Church dedicated by Archbishop Heiss (cornerstone October 1885).

  447. Milwaukee Road union depot opens on Everett Street.

  448. $4,500 improvement in the tax rolls — the most expensive house on its block.

  449. 1886Tiefenthaler Housecompleted

    First improvements $1,450 in the 1886 tax rolls.

  450. Occupied by Hook and Ladder Co. No. 5 December 1, 1886.

  451. 1887Judge William J. Turner Houseconstruction start

    Begun spring 1887 on speculation by Howard H. Hoyt.

  452. 1887Graham Rowcompleted

    Builder John Graham died the same year.

  453. Unveiled by Solomon Juneau's granddaughter, Hattie White.

  454. 1887Juneau Parkdesignated landmark

    The Solomon Juneau Monument was erected within the park -- a second, distinct memorial act on the same site, seventeen years after the park's naming.

  455. Sold March 1888 for $19,000 — among the most expensive houses built in the city that year.

  456. Replacement 39-ft octagonal cast-iron tower (built 100 ft inland after shoreline erosion, Congress approved $15,000 Aug. 4, 1886, completed Dec. 1887) lit.

  457. c. 1888Systematic building permits begincivic

    The city begins keeping systematic permit ledgers (~1888) — the start of the primary construction record this database verifies against.

  458. Date stones of 1888 in the sandstone keystones.

  459. Permit No. 136, October 8, 1889; $9,000.

  460. Permit No. 202, November 11, 1889.

  461. Plymouth Congregational Church (E. T. Mix).

  462. July 1889 fire destroyed the main brewery complex (~$1,000,000 loss incl. 52,000 barrels of beer).

  463. 1889Octagon Housemoved

    Likely moved to the present lot, probably by owner Joseph Dolphin (no improvement in tax rolls before 1889).

  464. Rental ad for the new west unit, Milwaukee Sentinel, October 22, 1889.

  465. Permit June 1888; the Adlers moved in 1889.

  466. Evening Wisconsin and Milwaukee Sentinel, both March 23, 1889.

  467. On the site of the Kleinsteuber Machine Shop, where Sholes perfected the first practical typewriter (1869).

  468. 1890Golda Meir Schoolcompleted

    Fourth Street School opens.

  469. Church dedicated July 28, 1890.

  470. C&NW lakefront depot completed (construction 1889-1890).

  471. Permit April 1890.

  472. 1890Lake Parkother

    Among the first five public parks acquired by the City of Milwaukee (Board of Park Commissioners, Christian Wahl, president); the initial 24 of the park's eventual 140 acres acquired this year -- two years before Frederick Law Olmsted and Company was engaged (1892, already on record) to design it.

  473. 128.5 acres purchased as "West Park."

  474. 1891Friedmann Rowcompleted

    Five-unit investment row for Ignatius Friedmann.

  475. 1891George Schuster Houseconstruction start

    Permit No. 126; listed cost $23,000 excluding interior finishes.

  476. Mayer Building (#2006) erected to Henry Messmer's design; the pair later combined.

  477. Hall permit No. 922, December 16, 1890 ($3,000); tavern portion slightly earlier.

  478. 1892Pabst Buildingcompleted

    Tallest building in Wisconsin at completion.

  479. Original L-shaped block.

  480. 1892Third Ward firedisaster

    October 28, 1892: fire destroys roughly 440 buildings across 16 blocks of the Third Ward — the single largest loss of pre-1892 building fabric in city history; the warehouse district that replaced it is the Historic Third Ward of today.

    Twenty Blocks by Midnight: the Fire That Remade the Third Ward

    Open as a standalone story →

    At about 5:40 on the evening of Friday, October 28, 1892, spontaneous combustion ignited stock inside the Union Oil and Paint Company's building on the Milwaukee River at Water Street, just south of St. Paul Avenue. An oil-and-paint warehouse was the worst possible seed for a fire, and the weather finished the job: strong westerly and northwesterly winds drove the flames east toward the lake and south toward Erie Street, straight across the most densely packed wooden neighborhood in the city. By midnight roughly twenty city blocks of the Third Ward had burned in whole or in part.

    The Third Ward of 1892 was Milwaukee's Irish quarter — a low peninsula of small frame houses, boarding houses, warehouses and rail yards wedged between the river and the lake, home to a community that had already absorbed one catastrophe when the sinking of the Lady Elgin in 1860 drowned some three hundred of its people. The fire took the physical neighborhood the way the wreck had taken its men: more than 440 buildings were destroyed, most of them small wooden homes, and more than 350 families — about 2,500 people, the great majority Irish — were burned out of theirs, with another 150 families suffering losses. For a city built substantially of wood, it was and remains the largest single destruction of Milwaukee's early building fabric ever recorded; for the pre-1892 construction record this database tracks, it is the great erasure event.

    Milwaukee's fire department could not fight twenty blocks alone, and help came by rail: engine companies from Chicago, Kenosha, Racine, Sheboygan and Oshkosh were loaded onto trains and run into the city, though most arrived too late to do more than help contain the perimeter. Given the scale, the human toll was mercifully small — five dead, among them two firefighters and an unidentified man crushed by a collapsing wall, plus two women whose weak hearts failed in the panic. Relief committees distributed meal tickets, clothing and donated funds through the winter.

    What the fire did not do was rebuild the neighborhood it found. The burned district's rail and harbor access made it more valuable as commercial land than as workers' housing, and the city's business leadership promoted warehouse construction over residential reconstruction. The Irish families largely did not return — they resettled west, in Tory Hill and above all in Merrill Park, and the ward's residential population never approached its pre-fire numbers. In their place, through the 1890s and 1900s, rose the brick-and-timber warehouse and light-manufacturing district whose robust commercial blocks were built to the lessons of 1892.

    The irony of the Third Ward fire is that its destruction is now the neighborhood's protected heritage. The warehouse district that replaced the burned cottages survived long enough to be revalued, and today it is the Historic Third Ward — a National Register historic district whose "historic" fabric is almost entirely post-fire. Nearly everything older burned in one October night; the district's very name quietly commemorates the boundary the fire drew through Milwaukee's building record.

  481. Rear 2-story brick wing added as Weissbier brewing wound down.

  482. Dedicated.

  483. Construction spanned almost seven years.

  484. 1892Hausmann Buildingcompleted

    1891-92 main block, $7,000.

  485. 1893Roman Catholic Church of the Gesuconstruction start

    Cornerstone laid; completed within 20 months.

  486. Liquor license transferred February 20, 1893; the "since 1891" neon sign is incorrect.

  487. New tower by George B. Ferry, 1892-93.

  488. 1893Goldsmith Buildingcompleted

    Built year per MPL photo records (Emporis: 1892).

  489. 1893Panic of 1893economic

    National depression halts construction; the just-completed Pabst Building towers over a frozen skyline. Mitchell's old bank reorganizes.

  490. 1893Milwaukee City Hallconstruction start
  491. School built 1892-93 (Eschweiler) after the Third Ward fire swelled the parish.

  492. Tax assessment jump and first directory listing, 1894.

  493. Budget slightly over $150,000.

  494. One-story slate-clad kitchen addition.

  495. 1894Robert Machek Housecompleted

    First listed at the address 1894.

  496. 1895Pabst Theatercompleted

    Opened within seven months of the fire that destroyed the Nunnemacher Grand Opera House.

  497. A second, longer intake tunnel was added; the project killed 14 tunnel workers in an accident.

  498. 1895Milwaukee Central Libraryconstruction start
  499. 1895Milwaukee City Hallcompleted

    Tallest habitable building in the US at completion.

  500. 1896Basilica of St. Josaphatconstruction start

    Built with salvaged Chicago Federal Building stone, largely by parish labor under Father Grutza.

  501. 1896Hausmann Buildingexpanded

    Rear Vine Street apartment building, also by Koch.

  502. Opens as the Uihlein Theater.

  503. 1896Germania Buildingcompleted

    Pediment cartouche dated 1896 (field-verified 2026-07-24).

  504. 1896Pabst Tavern (Juneau Avenue)construction start

    Permit dated May 14, 1896; built for $5,600.

  505. Two-story frame store, $2,500 (permit April 21, 1896).

  506. Permit #664, June 29, 1897; cornerstone date.

  507. Permit No. 562, October 30, 1897; $8,000.

  508. Harmonious north addition; similar south addition followed 1926.

  509. 1897Washington Parkcompleted

    Bulk tree/shrub planting phase completed: over 12,000 trees and shrubs planted 1896-97.

  510. 1897George Koch Housecompleted
  511. Classical Revival addition by Mollerus and Lotter.

  512. Permit No. 668, March 23, 1898; $25,000 factory.

  513. Permit #701, August 1, 1898 (the family reportedly moved in in 1897).

  514. North addition by Henry G. Lotter & Henry Mollerus.

  515. Milwaukee-Downer College trustees decide to erect a dormitory, estimated $20,000 -- an earlier planning-stage mention than the $25,000 final cost and A. C. Eschweiler architect selection recorded the following year (1900-10-27). Per American Architect and Building News, Nov. 1899.

  516. 1899St. Casimir Church Complexconstruction start

    Foundation work begun on the St. Kasimir Polish Catholic Church, per American Architect and Building News, Sept. 1899 (John Schramka credited with beginning foundation work; E. Brielmaier & Son architects; cost complete $65,000).

  517. 1899St. Casimir Church Complexconstruction start

    Cornerstone laid December 1899.

  518. 1899Calvary Cemeterycompleted

    Brielmaier chapel (1899) and gatehouse (1897).

  519. Ferry & Clas prepared plans for a large two-story addition to the Republican House. Per American Architect and Building News, July 1900.

  520. 1900Washington Parkrenamed

    Renamed Washington Park for George Washington -- a separate event from the 1891 purchase and the early-1890s Olmsted design commission; no dedication-ceremony record found.

  521. c. 1900Coughlin Housecompleted

    Built between 1894 and 1909, in the Town of Wauwatosa before annexation.

  522. 1901Lamers Blockaltered

    Storefront remodel by Uehling and Linde ($950); builder William Ziemann.

  523. Finished fall 1901.

  524. Dedicated July 1901; interior decoration essentially complete by 1929.

  525. First permanent Christian Science church structure in Wisconsin.

  526. Classical/Colonial Revival remodel ($1,200) removed the cupola and Italianate porch.

  527. 1903Paul Weise Buildingcompleted
  528. 1903Van Ells Drug Storecompleted

    Permit No. 384, July 20, 1903.

  529. Permit #1148, July 5, 1904.

  530. Permit No. 442, March 9, 1904.

  531. Permit issued for the Northwestern National Insurance Co. office building, Jackson & Wisconsin Sts.; cost $120,000. Per American Architect and Building News, spring 1904.

  532. H. A. Betts remodel (permits 1903-04) gave the present Arts and Crafts appearance.

  533. Completed by October 1904.

  534. Jacob Jacobi's German Renaissance Revival remodeling for Albert G. Seeboth (permit No. 2705).

  535. Permit July 28, 1905; $6,000 store-and-flat.

  536. Occupied 1906 (built 1904-06).

  537. South addition by Kirchhoff & Rose for William J. Uihlein ($3,500).

  538. Auditorium board revising plans after bids came in too high (Aug./Sept. 1907); board then accepted bids until Oct. 21, 1907 for construction on Ferry & Clas's plans (Sept. 1907). Per American Architect and Building News.

  539. Building completed (basement finished December 1906).

  540. Permit taken out May 31, 1907.

  541. 1907Milwaukee Auditoriumconstruction start

    Replacing the Exposition Hall destroyed by fire June 4, 1905.

  542. Supt. Carroll G. Pearse (Milwaukee Public Schools) placed in charge of plans for a $250,000 addition to the Milwaukee Public Library & Museum -- an earlier, pre-architect-selection planning stage of the same addition Ferry & Clas were commissioned for later that year. Per American Architect and Building News, Feb. 1907; further detailed Nov. 1907 at 332'x107', three stories, stone facing over brick, Henry L. Ward (director).

  543. Twin side towers added by Bruns and Bruns.

  544. 1908St. Mary's Hospitalconstruction start

    Permit No. 1314; cornerstone laid May 9, 1909.

  545. To the Roman Catholic Archdiocese as the Archbishop's residence (to mid-1970s); Wisconsin Heritages, Inc. from 1978.

  546. Emanu-El Congregation planning a new temple building; site assured. Per American Architect and Building News, Oct. 1908. No address, architect, or cost given by the notice -- not clear whether this describes a replacement for the temple already on record (standing by 1879 per the Beck & Pauli bird's-eye legend) or a distinct later building; recorded as an event on the existing row rather than assumed to be a separate structure.

  547. Saloon with proprietor's flat, $12,000.

  548. Milwaukee Auditorium opens.

  549. Western addition ($37,546) doubled the school's size.

  550. 1909Charles Allis Housecompleted
  551. East facade extended nine bays by Ferry and Clas, seamlessly.

  552. 1910Stroh Buildingcompleted
  553. Patients moved in.

  554. Erected by R. D. Whitehead as a memorial to his pets.

  555. First story 1909, second story 1910.

  556. Refacing removed the original shaped gable (permit July 31, 1911); 1910 expansion $6,900.

  557. Ionic front porch by Henry C. Koch & Sons replaced the earlier wooden porch.

  558. Upper floors divided into 23 rooms — later the Stag/New State Hotel (1915-1975).

  559. Full-length masonry front porch replaced the two small entry porches ($200 permit).

  560. Permit #5171, November 5, 1913.

  561. 1913Villa Uhrigaltered

    Southeast wing shortened ~2/3 and stuccoed when N. 34th St. was cut through.

  562. The 40 x 103 ft hall cost $30,000 (permit June 5, 1913).

  563. Opened as the tallest office building in Milwaukee.

  564. Family moved in fall 1914; cost $25,000.

  565. 1915Kenwood Masonic Templeconstruction start

    Begun June 1915.

  566. Church completed May 1915 (permit October 9, 1914).

  567. The 800-ton double-track truss was swapped into place in a few hours — a nationally reported engineering feat.

  568. Dedicated November 1916.

  569. 1916Hotel Medfordcompleted

    Built as four stories; enlarged to nine in 1924.

  570. Permits for all six houses taken out.

  571. 1916Coast Guard Stationcompleted

    Ready for occupancy ("New Coast Guard Station Ready for Use," Milwaukee Sentinel).

  572. All six houses "about completed" per the inspector's notes.

  573. Three-ton bronze "Germania" statue removed amid WWI anti-German sentiment (never found); the Germania name chiseled off.

  574. 1919Bzdawka Buildingcompleted

    Permit April 22, 1919; nearly complete August 9, 1919.

  575. Converted to a soda fountain with Prohibition; a tavern again after repeal (Westmore Tavern to c. 1966).

  576. 1920Myron T. MacLaren Houseconstruction start

    Permit issued, $85,000 estimate.

  577. Construction date unconfirmed; pulverized-coal era of the plant.

  578. Permitted as a "yacht bungalow."

  579. 1922Carpenter Buildingcompleted

    Building completed 1922; the Wisconsin Theater within opened 1924.

  580. Wood-shingled Gothic belfry and art glass windows added.

  581. Addition, also by Brust & Philipp.

  582. Approved by the building inspector.

  583. 1922-23 remodeling; Greek Revival rectory with Federal-style entrance built alongside.

  584. Cooperative conversion — probably Milwaukee's first housing cooperative.

  585. Became South Side Hospital (to c. 1943), a Depression-era "station" exchanging script for food.

  586. Bids April 1924; contractors listed in the Daily Reporter, May 15, 1924.

  587. Converted to six apartments as the Redstone (permit Feb. 14, 1924).

  588. Sold and converted to Kortsch Storage; rooftop elevator tower added.

  589. Opened September 1924, replacing the 1871 swing bridge.

  590. 1925Avalon Theaterconstruction start

    Excavation began December 1925; construction halted twice, resumed October 1928.

  591. $40,000 two-story social hall (Hugo C. Haeuser).

  592. 1925Eagles Clubconstruction start

    Excavation began; cornerstone laid July 29, 1926.

  593. Luxury 72-unit apartment building, est. $650,000.

  594. 1926Randolph Hotelcompleted
  595. First service held September 13, 1926 (groundbreaking February 15, 1925).

  596. 1926Hotel Royalcompleted
  597. Permit No. 14452, June 11, 1926; completed by November.

  598. Neo-Classical rear education/social annex (~$38,000), built by the Meredith Brothers.

  599. Flat remodeled into four offices (architect George Klenzendorf).

  600. Became the nurses' home for Roger Williams Hospital (to c. 1935).

  601. 1927Hotel Marshallcompleted
  602. 1927Eagles Clubopened

    Dedicated; 25,000+ visitors toured the $1,250,000 building.

  603. Permit No. 18756, July 23, 1926; est. cost $202,986.

  604. $50,000 Colonial/Georgian Revival front addition by Carl Barkhausen obscured the original facade.

  605. Four-story rear addition at 731 N. Jackson (Holabird and Root); remodeled with six added floors 1963.

  606. Light and fog signal placed in commission on the current (1926-built) square steel-frame structure.

  607. 1928Jefferson Hallcompleted
  608. Five houses built 1926-28; No. 36 manned May 16, 1928.

  609. 1929Avalon Theateropened

    Opened with the all-talking Paramount release The Doctor's Secret.

  610. Elevated to Minor Basilica — the third basilica in the United States.

  611. City Hall tower fire; restored 1930.

  612. Dedicated and opened to traffic.

  613. Tower restored after the 1929 fire.

  614. $8,000 brick-veneer remodel into the present Mediterranean Revival form.

  615. FLW verdict: "a million dollar rockpile."

  616. Five-story south wing 1929-32; two more stories added 1940.

  617. Lost in the Depression at sheriff's sale ($13,500) after an unprofitable olive-packaging venture.

  618. Mark Pfaller's English Revival remodel for Mary Patock (est. $3,600) gave the present character.

  619. Major fire guts interior; rebuilt.

  620. 1936-37 Art Deco transformation by Herbert W. Tullgren (permit March 23, 1936, $200,000).

  621. Moved to Estabrook Park by WPA; restored as museum.

  622. Razed after the county moved west; square becomes Cathedral Square Park.

  623. Rebuilding of 1936-42 after the 1935 fire, by W. R. Perry of Pittsburgh.

  624. Tower's conical roof removed (per permit records).

  625. Conveyed under Allis's will to the City as an art museum after his widow's death.

  626. 1944-45 "Hide House" wing (Grassold & Johnson).

  627. Remodeled into a modern office (design William Gettelman); interior used cypress from old beer storage tanks.

  628. Sold to the University of Wisconsin for $75,000; became Kenwood Hall.

  629. Converted to sleeping rooms (occupancy granted end of 1951) after c. 1950 fire repairs.

  630. Shaped gables, finials and parapet ornament lost in a parapet "repair".

  631. 1950s renovation stripped the scored plaster coating and rebuilt the entrance.

  632. Dr. Martin Luther King Jr. spoke here on his 1957 Milwaukee visit.

  633. Arched entrance portal replaced with plain Lannon stone facing; first-floor windows filled with glass block.

  634. Sold to Greater Galilee Baptist Church.

  635. Major banking-space remodeling; original first-story glazing and bronze spandrels replaced.

  636. Demolished 1961 per Cinema Treasures (Emporis: 1962); site later covered by the Reuss Federal Plaza.

  637. 1964Hotel Medforddemolished

    Torn down per onmilwaukee (Emporis gives no year).

  638. 1966Everett Street Depotdemolished

    Razed June 15, 1966, after closing August 1, 1965.

  639. 1964-67 College Women's Club restoration and compatible wing (F. J. Schweitzer) after a 1963 demolition threat.

  640. 1968North Western Stationdemolished

    Demolished 1968 per Encyclopedia of Milwaukee (Emporis: 1967); the preservation fight it triggered led to Historic Milwaukee, Inc.

  641. Tower reclad in copper (1960s removals: iron cresting, gable peaks truncated, balustrade mostly removed).

  642. 1973Second Ward Savings Bankdesignated landmark

    NRHP 1973 (Milwaukee Landmark 1969; HABS 1969); Milwaukee County Historical Center since the 1960s.

  643. 1973North Point Water Towerdesignated landmark

    Listed on the National Register of Historic Places (Milwaukee landmark 1968; HABS 1969).

  644. 1974Hotel Royaldemolished

    Razed for a Blue Cross Blue Shield headquarters (closed 1973).

  645. 1974Iron Blockdesignated landmark

    Listed on the National Register of Historic Places.

  646. Original rubber-block decks replaced with open steel mesh.

  647. Relocated for preservation at Old World Wisconsin.

  648. 1975Roman Catholic Church of the Gesudesignated landmark

    Designated a Milwaukee Landmark; recorded by HABS.

  649. 1976Pabst Theaterrestored

    Extensive restoration; blank east wall received its present treatment.

  650. 1979Trinity Lutheran Church Complexdesignated landmark

    NRHP listed (honorary Milwaukee Landmark 1967).

  651. 1979Graham Rowdesignated landmark

    NRHP listed after the Park East Freeway threat (eligible Nov. 30, 1977).

  652. 1980Sixth Church of Christ, Scientistdesignated landmark

    NRHP 1980 (Milwaukee Landmark 1978).

  653. 1981Pabst Buildingdemolished

    Demolished for the 100 East Wisconsin project.

  654. 1982Goldsmith Buildingdemolished

    Cleared for 411 East Wisconsin Center (Emporis: 1983).

  655. 1983Germania Buildingrestored

    1980s Conlan restoration: balcony reopened 1983, gilded "Germania" letters reinstated.

  656. Fire gutted much of the interior and destroyed the monitor roof; exterior walls intact.

  657. 1985Randolph Hoteldemolished

    Imploded, July 1985.

  658. 1986Carpenter Buildingdemolished

    Demolished 1986 per Shepherd Express/BizTimes (Emporis: 1987), for the convention center.

  659. 1986George Schuster Housedesignated landmark

    Listed in the National Register of Historic Places.

  660. Rear coal-storage room razed September 1986; smokestack earlier removed on electrification.

  661. 1989Coast Guard Stationdesignated landmark

    NRHP listed; vacant since 1980 and threatened with county demolition at the 2001 report.

  662. 1989100 East Wisconsincompleted

    Context row: successor tower opens on the founding site.

  663. 1991Sanford R. Kane Housedesignated landmark

    NRHP listed.

  664. 1991Emanuel D. Adler Housedesignated landmark

    NRHP listed.

  665. David Uihlein remodel added Federal-style portico and center entrance.

  666. c. 1994Friedmann Rowrestored

    Early-1990s restoration to the original five-townhouse configuration; brick chemically cleaned 1993-94.

  667. NRHP listed (local designation denied 1986, achieved 2016).

  668. Cleared for the convention center (Frontier Airlines Center).

  669. 1998Stroh Buildingdemolished

    Per Emporis, cleared for the Johnson Controls Brengel Technology Center; date not independently corroborated.

  670. Destroyed by fire per WHS AHI 80481.

  671. Carved side-elevation bargeboards permanently removed.

  672. Demolition year per Emporis only.

  673. 2008Coast Guard Stationdemolished

    Demolished per WHS AHI 28442; NRHP delisting 2009-07-01.

  674. Electrical fire; vacant and secured afterward.

  675. 2014Iron Blockrestored

    Cast-iron facade restoration completed.

  676. The 1916 Arts and Crafts porch removed and crudely replaced — prompting the temporary designation.

  677. Wood-grain vinyl siding and aluminum trim covered the decorative details.

  678. Sold to the Clarke Square Neighborhood Initiative for office use.

  679. date unknownOld J. & L. Ward standmoved

    The old building was moved back on the lot and a new one erected at 389 East Water.

  680. date unknownThe New Arcademoved

    Moved across the river on the ice.

  681. Moved twice; No. 270 First Avenue as of 1881.

  682. date unknownFirst tannerydemolished

    Every vestige long gone by Buck's writing.

  683. moved

  684. Later turned and a story added — long known as the old Larrabee House.

  685. date unknownHubbard & Bottsford milldemolished

    All traces gone by 1889.

  686. Later removed to Ferry St., South Side — the name stayed legible for years.

  687. Long the residence of Dr. L. W. Weeks; removed to Wisconsin St. corner of Milwaukee; sold 1874.

  688. date unknownDr. S. E. Graves housedemolished

    Removed for the new jail.

  689. date unknownJoseph Keyes housedemolished

    Replaced by the new Police Station.

  690. date unknownJohn Y. Smith frame dwellingdemolished

    Removed for Mrs. Levi Blossom's block.

  691. date unknownSamuel Robinson housedemolished

    Removed for Siddle's store.

  692. date unknownPeter Juneau housedemolished

    Removed for Thos. H. Brown's carriage manufactory.

  693. date unknownLudington paper milldemolished

    pulled down later (smoke stack demolished the day of the Badger State launch)

  694. date unknownPutnam warehousefire

    Burned per Buck: burned later

  695. H. Delcampo fitted up the Farmer's Inn as the Western Exchange.

  696. date unknownHotel Marshalldemolished

    Status demolished per Emporis and WHS AHI; year unconfirmed in both.

  697. later moved by Jacob Nunnemacher to foot of Oneida (a woolen factory in 1881)

  698. Later removed to the SE corner of Broadway & Wisconsin as a real estate office.

  699. Burned twice, rebuilt, remodeled.

  700. date unknownUnitarian church (1843)moved

    Sold to the Episcopalians and moved to the old cemetery lot on Spring between 8th & 9th as St. James'.