Pryor Avenue Iron Well
1882–1883 · Utilitarian (public well) · extant
1710 E. Pryor Ave (public right-of-way)
Corroborated
Utilitarian public well at 1710 E. Pryor Ave. Still flowing — the last surviving public well of its kind in Milwaukee.
How it was built
Exposed-aggregate concrete monolith with moulded cap over a 1,500-ft artesian well and iron plumbing. Drilling began October 1882 and reached final depth early 1883; the system was complete by 1888, giving Bay View safe drinking water and fire protection before city water service. The present concrete wellhead dates to c. the 1920s.
People & firms
- City of Milwaukee — client (public works project for Bay View)
Materials
- exposed aggregate concrete — structure
Timeline
- 1882construction start — Drilling began October 1882; final 1,500-ft depth reached early 1883.
- 1883completed — System complete by 1888.
Sources
- City of Milwaukee HPC designation study reports (mirrored set), City of Milwaukee Historic Preservation Commission · supports: drilling dates, purpose