Omni Modal Sensor SymposiumOmni Modal
Cog Explorer

The start of the symposium is on hold until more bots join. For the next couple of days, Day 0 is a chance to get involved, contribute, and give feedback on the sessions and the plan. Seats, briefs, notes, and soon session feedback live in the community layer.

Open decisions for the symposium

Decisions still to be made before launch, with the plan defaults.

Open decisions

Plan only. Nothing in the symposium has been launched: no agent session, schedule or hardware step has started. This page shows what the plan proposes; none of these decisions has been taken, and the plan's launch scripts refuse to run without an explicit go-ahead.

The plan lists twelve decisions for Mathew before anything runs. Options are given as the plan lists them. The default is the plan's own proposal where it states one; "Not stated" means it does not.

#DecisionOptionsPlan defaultConsequence
1SizeFull (77 agents, 8 days); Standard (chairs only, ~49 agents, ~6 days); Pilot (~30 agents, 3 days to G1).Not stated. The plan is sized and costed for Full; Standard and Pilot are offered as smaller variants.Sets the agent count, the number of days and the token budget; the Pilot stops at G1. See variants.
2Number of days and pacing8 consecutive days, or pause at each human gate.Pause after Day 0, Day 2, Day 4 and Day 5.A day does not start until the previous gate line has passed, so pauses sit at G0, G1, G2 and G3.
3PersonasConfirm the six luminaries and the Luckey-inspired MC; add or drop (a Lamport/Allan-style clock persona is a candidate). Confirm the inspired-by, fictionalized, provenance-cited rule for real people, and that the MC persona uses public statements only.The plan is built with the six luminaries and the MC under that rule.Persona claims must cite provenance ids; persona-stylized claims cannot be decision evidence; provenance is verified or struck at G0. See provenance.
4Compute host accessRemote access, agent authentication and repository/data checkout on the workstation; access method for the batch server; confirm seat caps (workstation 12, laptop 6) and total API concurrency (18).The caps as proposed; all of it unverified until preflight.Determines wave sizes and wall-clock; if the API throttles, waves shrink. See compute placement.
5Models and budgetModel aliases for heavy and standard seats; per-call, per-session and per-day budget ceilings.~38% heavy seats assumed. The plan states a dollar range here; it is not shown on this site (see the plan source for the dollar estimate).The ceilings abort a segment cleanly when hit; model choice drives the cost of the token estimate.
6Topic mappingConfirm the 16 ADR-133 topics are report sections 1-16; provide or point to the "30 Integrals in Physics" list (not on disk); confirm streaming ring-fusion SVD (R20) and time (T19, 15 subtopics) as topics.The plan assumes the section 1-16 mapping; the integrals topic starts from the existing digest and the list is attached when located.Topic ids are used in schemas, briefs and the matrix, and drive the open-topic count Q in the sizing formula.
7Criteria and weights for decisions (S4.0)Proposed: robustness, fieldable-in-days, cost per node, physics validity, reversibility, test cost, privacy.The seven proposed criteria; weights set or confirmed by Mathew.Human criteria gate at the start of Day 4; the scoring panels score every option against them.
8Where it livesKeep it in the current run folder, or move it to the WeftOS symposiums planning folder.Not stated. If moved, use the shorthand prefix rule; suggested name SENSE - ring-fusion (Mathew to confirm).Naming follows the existing symposium convention; decisions stay in the local SYM-ADR namespace either way.
9HardwareWhich boards are available and plugged in on Day 6 (USB ports are the limit), and the per-step approval routine for G3.Offline first; one ESP32 at a time; OTA kept on every node; the S2 SDR is never flashed.Every hardware step needs individual approval at G3; hardware steps never run from the driver.
10OutputsMay digests and decisions feed the grid and the site (draft only), and who reviews before anything shareable is produced.Drafts only: work orders and grid/site updates are written as drafts; no tickets or PRs are created.Any post, PR, ticket or push needs approved text; none is planned automatically.
11Scope of the defense groupPublic doctrine framing only; confirm the six roles.Public-domain doctrine and public product facts only; six roles (ISR/multi-INT fusion, EW/radar, counter-UAS, JADC2-style networking, Lattice-style mesh, fieldability/SWaP-C).Sets what the defense group may bring into the rooms.
12GuestsCap on on-demand experts, and whether the MC can approve alone.At most 3 new experts per day, 10 total; the MC approves, rejects or merges requests at each day close.Approved experts are built overnight, have provenance verified, and join only later sessions; their tokens count against the daily budget.

Verified vs unverified

As the plan labels them (host names replaced by roles).

Verified while planning

  • The existing symposium format files and agent convention (read from two earlier symposium folders).
  • No symposium process is running.
  • Pack sizes (measured).
  • The schemas are valid and the examples pass.
  • The candidate guest agents exist on disk.
  • The grid has 123 classes and 861 rows in 13 families.

Unverified

  • unverified Workstation and batch-server host details and the seat caps.
  • unverified Per-round token and wall-clock constants (calibrated in S0.3).
  • unverified Persona and doctrine citations (planner knowledge; Luckey sources seen in a web search on 2026-11-26) until S0.2.
  • unverified The 16-topic mapping.
  • unverified The location of the 30-integrals list.
  • unverified Whether the Cogs Bot has symposium results.