Open decisions for the symposium
Decisions still to be made before launch, with the plan defaults.
Open decisions
Plan only. Nothing in the symposium has been launched: no agent session, schedule or hardware step has started. This page shows what the plan proposes; none of these decisions has been taken, and the plan's launch scripts refuse to run without an explicit go-ahead.
The plan lists twelve decisions for Mathew before anything runs. Options are given as the plan lists them. The default is the plan's own proposal where it states one; "Not stated" means it does not.
| # | Decision | Options | Plan default | Consequence |
|---|---|---|---|---|
| 1 | Size | Full (77 agents, 8 days); Standard (chairs only, ~49 agents, ~6 days); Pilot (~30 agents, 3 days to G1). | Not stated. The plan is sized and costed for Full; Standard and Pilot are offered as smaller variants. | Sets the agent count, the number of days and the token budget; the Pilot stops at G1. See variants. |
| 2 | Number of days and pacing | 8 consecutive days, or pause at each human gate. | Pause after Day 0, Day 2, Day 4 and Day 5. | A day does not start until the previous gate line has passed, so pauses sit at G0, G1, G2 and G3. |
| 3 | Personas | Confirm the six luminaries and the Luckey-inspired MC; add or drop (a Lamport/Allan-style clock persona is a candidate). Confirm the inspired-by, fictionalized, provenance-cited rule for real people, and that the MC persona uses public statements only. | The plan is built with the six luminaries and the MC under that rule. | Persona claims must cite provenance ids; persona-stylized claims cannot be decision evidence; provenance is verified or struck at G0. See provenance. |
| 4 | Compute host access | Remote access, agent authentication and repository/data checkout on the workstation; access method for the batch server; confirm seat caps (workstation 12, laptop 6) and total API concurrency (18). | The caps as proposed; all of it unverified until preflight. | Determines wave sizes and wall-clock; if the API throttles, waves shrink. See compute placement. |
| 5 | Models and budget | Model aliases for heavy and standard seats; per-call, per-session and per-day budget ceilings. | ~38% heavy seats assumed. The plan states a dollar range here; it is not shown on this site (see the plan source for the dollar estimate). | The ceilings abort a segment cleanly when hit; model choice drives the cost of the token estimate. |
| 6 | Topic mapping | Confirm the 16 ADR-133 topics are report sections 1-16; provide or point to the "30 Integrals in Physics" list (not on disk); confirm streaming ring-fusion SVD (R20) and time (T19, 15 subtopics) as topics. | The plan assumes the section 1-16 mapping; the integrals topic starts from the existing digest and the list is attached when located. | Topic ids are used in schemas, briefs and the matrix, and drive the open-topic count Q in the sizing formula. |
| 7 | Criteria and weights for decisions (S4.0) | Proposed: robustness, fieldable-in-days, cost per node, physics validity, reversibility, test cost, privacy. | The seven proposed criteria; weights set or confirmed by Mathew. | Human criteria gate at the start of Day 4; the scoring panels score every option against them. |
| 8 | Where it lives | Keep it in the current run folder, or move it to the WeftOS symposiums planning folder. | Not stated. If moved, use the shorthand prefix rule; suggested name SENSE - ring-fusion (Mathew to confirm). | Naming follows the existing symposium convention; decisions stay in the local SYM-ADR namespace either way. |
| 9 | Hardware | Which boards are available and plugged in on Day 6 (USB ports are the limit), and the per-step approval routine for G3. | Offline first; one ESP32 at a time; OTA kept on every node; the S2 SDR is never flashed. | Every hardware step needs individual approval at G3; hardware steps never run from the driver. |
| 10 | Outputs | May digests and decisions feed the grid and the site (draft only), and who reviews before anything shareable is produced. | Drafts only: work orders and grid/site updates are written as drafts; no tickets or PRs are created. | Any post, PR, ticket or push needs approved text; none is planned automatically. |
| 11 | Scope of the defense group | Public doctrine framing only; confirm the six roles. | Public-domain doctrine and public product facts only; six roles (ISR/multi-INT fusion, EW/radar, counter-UAS, JADC2-style networking, Lattice-style mesh, fieldability/SWaP-C). | Sets what the defense group may bring into the rooms. |
| 12 | Guests | Cap on on-demand experts, and whether the MC can approve alone. | At most 3 new experts per day, 10 total; the MC approves, rejects or merges requests at each day close. | Approved experts are built overnight, have provenance verified, and join only later sessions; their tokens count against the daily budget. |
Verified vs unverified
As the plan labels them (host names replaced by roles).
Verified while planning
- The existing symposium format files and agent convention (read from two earlier symposium folders).
- No symposium process is running.
- Pack sizes (measured).
- The schemas are valid and the examples pass.
- The candidate guest agents exist on disk.
- The grid has 123 classes and 861 rows in 13 families.
Unverified
- unverified Workstation and batch-server host details and the seat caps.
- unverified Per-round token and wall-clock constants (calibrated in S0.3).
- unverified Persona and doctrine citations (planner knowledge; Luckey sources seen in a web search on 2026-11-26) until S0.2.
- unverified The 16-topic mapping.
- unverified The location of the 30-integrals list.
- unverified Whether the Cogs Bot has symposium results.