Gate by gate: what is checked, by whom, and what blocks progress.

Gates in the plan

Plan only. Nothing in the symposium has been launched: no agent session, schedule or hardware step has started. This page shows what the plan proposes; no gate has been run and no gate report exists yet.

The plan has five numbered gates (G0-G4), two soft gates at the end of Day 1 and Day 3, and a human criteria check at the start of Day 4. The phases are Prep (Day 0), Problems (Days 1-2), Decide (Days 3-4) and Solutions (Days 5-7). A day does not start until the previous gate line has passed. Every gate result is written as a gate-report object (see Schemas).

human marks a gate that needs a decision from Mathew. Human gates are scheduled at their real duration but run asynchronously.

GateWhenWhat is checkedWho decidesEvidence requiredPass / fail rule
G0 humanEnd of Day 0 (S0.1-S0.3); Day 0Part 1 (S0.1): all packs under budget and schema examples validate. Part 2 (S0.2): every persona provenance id verified or struck. Dry run (S0.3): dry-run objects schema-valid; calibration file updates the token and wall-clock constants.schema-gate + MathewG0 gate report; pack index; provenance register with status updated; calibration file.Pass: packs under budget; 100% of provenance ids verified or struck (struck items removed from persona sheets); dry-run objects 100% schema-valid after one retry.
G1-soft softEnd of Day 1 (S1.5); Day 1Every one of the 15 modality rooms has produced output; expert requests decided at intake.schema-gate (MC decides expert intake)G1-soft gate report; Day 1 digest; expert-request decisions.Pass: all 15 rooms have at least one valid problem statement and a digest. Coverage rule: every pack has at least one position paper by the end of Day 1.
G1 humanS2.5, end of Day 2; Day 2The problem register (deduped, ranked, frozen).schema-gate + MathewG1 gate report; frozen problem register; expert-request decisions.Pass: all problem statements valid; unverified ledger fraction at most 10%; zero claims without evidence; no persona claim without a provenance id. Mathew approves the frozen register.
G2-soft softS3.7, end of Day 3; Day 3Draft decision records; which options survive to scoring.schema-gateG2-soft gate report; Day 3 digest.Pass: draft decision records validate. Debate verdicts stay advisory until G2.
Criteria humanS4.0, start of Day 4; Day 4Decision criteria and their weights.Mathew (async)Criteria file with weights.Pass: weights confirmed or edited by Mathew.
G2 humanS4.3, end of Day 4; Day 4Ranked decision records with dissent and reversibility.schema-gate + MathewG2 gate report; ranked decisions; decision records with status.Pass: decision records valid; unverified fraction at most 8%; every accepted decision has at least one solution owner. Mathew accepts, edits or rejects each. No central ADR number is claimed.
G3 humanS5.4, end of Day 5 (applies through Day 6); Day 5Experiment plans, hardware allocation, safety review and the bench schedule.schema-gate + Mathew, per hardware stepG3 gate report; bench schedule; experiment plans with approval flag.Pass: plans valid; offline-first ordering respected; every hardware step individually approved by Mathew. On the Day 6 benches, any deviation aborts the step.
G4 humanS7.3, Day 7; Day 7The final report and the final ledger after a last red team.schema-gate + Mathew (sign-off)G4 gate report; final report; final ledger.Pass: all objects valid; unverified fraction at most 5%; zero claims without evidence; all persona claims carry provenance ids.

Sources: the plan's day schedule and schema-validation section, the syllabus "Gates at a glance" table and the session gate lines, and the schemas README.

Each gate

G0 human decision

  • When: End of Day 0 (S0.1-S0.3); Day 0.
  • Checked: Part 1 (S0.1): all packs under budget and schema examples validate. Part 2 (S0.2): every persona provenance id verified or struck. Dry run (S0.3): dry-run objects schema-valid; calibration file updates the token and wall-clock constants.
  • Who decides: schema-gate + Mathew.
  • Evidence: G0 gate report; pack index; provenance register with status updated; calibration file.
  • Pass / fail: Pass: packs under budget; 100% of provenance ids verified or struck (struck items removed from persona sheets); dry-run objects 100% schema-valid after one retry.

G1-soft soft gate

  • When: End of Day 1 (S1.5); Day 1.
  • Checked: Every one of the 15 modality rooms has produced output; expert requests decided at intake.
  • Who decides: schema-gate (MC decides expert intake).
  • Evidence: G1-soft gate report; Day 1 digest; expert-request decisions.
  • Pass / fail: Pass: all 15 rooms have at least one valid problem statement and a digest. Coverage rule: every pack has at least one position paper by the end of Day 1.

G1 human decision

  • When: S2.5, end of Day 2; Day 2.
  • Checked: The problem register (deduped, ranked, frozen).
  • Who decides: schema-gate + Mathew.
  • Evidence: G1 gate report; frozen problem register; expert-request decisions.
  • Pass / fail: Pass: all problem statements valid; unverified ledger fraction at most 10%; zero claims without evidence; no persona claim without a provenance id. Mathew approves the frozen register.

G2-soft soft gate

  • When: S3.7, end of Day 3; Day 3.
  • Checked: Draft decision records; which options survive to scoring.
  • Who decides: schema-gate.
  • Evidence: G2-soft gate report; Day 3 digest.
  • Pass / fail: Pass: draft decision records validate. Debate verdicts stay advisory until G2.

Criteria human decision

  • When: S4.0, start of Day 4; Day 4.
  • Checked: Decision criteria and their weights.
  • Who decides: Mathew (async).
  • Evidence: Criteria file with weights.
  • Pass / fail: Pass: weights confirmed or edited by Mathew.

G2 human decision

  • When: S4.3, end of Day 4; Day 4.
  • Checked: Ranked decision records with dissent and reversibility.
  • Who decides: schema-gate + Mathew.
  • Evidence: G2 gate report; ranked decisions; decision records with status.
  • Pass / fail: Pass: decision records valid; unverified fraction at most 8%; every accepted decision has at least one solution owner. Mathew accepts, edits or rejects each. No central ADR number is claimed.

G3 human decision

  • When: S5.4, end of Day 5 (applies through Day 6); Day 5.
  • Checked: Experiment plans, hardware allocation, safety review and the bench schedule.
  • Who decides: schema-gate + Mathew, per hardware step.
  • Evidence: G3 gate report; bench schedule; experiment plans with approval flag.
  • Pass / fail: Pass: plans valid; offline-first ordering respected; every hardware step individually approved by Mathew. On the Day 6 benches, any deviation aborts the step.

G4 human decision

  • When: S7.3, Day 7; Day 7.
  • Checked: The final report and the final ledger after a last red team.
  • Who decides: schema-gate + Mathew (sign-off).
  • Evidence: G4 gate report; final report; final ledger.
  • Pass / fail: Pass: all objects valid; unverified fraction at most 5%; zero claims without evidence; all persona claims carry provenance ids.

Schema validation at the phase gates

All outputs of a phase are validated against their schema (chosen from each object's schema_type) before the next phase starts. Every session in the syllabus and the run of show names its input and output schema types.

  • Ledger checks: evidence coverage; unverified fraction at most 10% at G1, 8% at G2, 5% at G4; zero failed entries; zero persona claims without provenance ids.
  • Bounce once, then block: a failing object goes back to its author once with the validator error. A second failure blocks the gate and goes to the MC.
  • No claim without evidence: every claim has at least one evidence reference, which must resolve to a ledger id, a context-pack anchor or a repository path.
  • Persona claims: a claim is either persona-grounded (must cite a provenance entry) or persona-stylized (allowed for analogy and voice only, never usable as decision evidence).
  • Failed entries: any ledger entry marked failed blocks the gate until it is struck or fixed.
  • Coverage: every one of the 15 packs must have at least one position paper by the end of Day 1.
  • Hardware: a bench-hardware experiment plan needs a required human approval and a named approver before its status can leave planned.
  • Topic ids must come from the plan's topic registry, or use the on-demand X-* prefix.
  • Gate report contents: artifacts checked (each with schema, valid flag and errors), ledger checks, per-pack coverage, thresholds, result (pass, fail, or pass with waivers), waivers, and human sign-off.