Symposium syllabus
Day-by-day, session-by-session syllabus with gates (plan only).
How the syllabus is laid out
Eight days and 43 sessions in three phases. Problems (Days 1-2) frame and critique; Decide (Days 3-4) converge and rank; Solutions (Days 5-7) design, test and integrate. Day 0 is preparation. Each session below is condensed to one row; the segment-by-segment timing, speakers and agent rounds are on the run-of-show page, and the typed objects named in the Output column are defined on the schemas page.
- Typed I/O rule. Every session names its input and output schema types (
input-brief,position-paper,problem-statement,decision-record,solution-spec,experiment-plan,scribe-digest,evidence-ledger-entry,gate-report,expert-request). Phase gates validate all outputs before the next phase starts; a failure bounces to the author once, then blocks the gate. - Context. The context packs are the only context an attendee loads.
- Expert requests can be raised in any position paper or digest and are decided at each day close (intake). See Appendix B.
- Who. Agent ids are listed in
code; group and room rosters are on the attendees page. The six luminaries (newton-mechanics,maxwell-fields,einstein-time,feynman-critic,shannon-information,gauss-fields-stats) and the MC (luckey-mc) are fictional characters inspired by public sources, each with a provenance block; see luminaries and MC. "The owner" is the human who approves each human gate.
Gates at a glance
Five validated gates plus one human weighting step. The full pass rules and reports are on the gates page.
| Gate | When | Who validates | Pass rule |
|---|---|---|---|
| G0 | end of Day 0 | schema-gate + owner | packs under budget; provenance verified or struck; dry-run objects valid |
| G1 | S2.5 | schema-gate + owner | all problem statements valid; unverified ledger ≤10%; no claim without evidence; persona claims carry PROV ids |
| criteria | S4.0 | owner | weights confirmed or edited |
| G2 | S4.3 | schema-gate + owner | decision-records valid; unverified ≤8%; every accepted decision has an owner; the owner accepts, edits or rejects each |
| G3 | S5.4 | schema-gate + owner | experiment plans valid; offline-first; each hardware step individually approved |
| G4 | S7.3 | schema-gate + owner | all objects valid; unverified ≤5%; zero evidence-less claims |
Soft checks (G1-soft at S1.5, G2-soft at S3.7) report but do not block.
Day 0: Prep
Goal: freeze the packs, verify provenance and dry-run the machinery. Scripts plus two audit agents; ~half a day.
| Session | Title | Who | Output | Gate |
|---|---|---|---|---|
| S0.1 | Pack generation, freeze and sizing check | script, schema-gate | frozen packs and index; gate-report | G0 part 1: all packs under budget; schema examples validate |
| S0.2 | Persona and source provenance verification | adv-citation-auditor, scribe-ledger, luckey-mc | evidence-ledger-entry; provenance register status updated | G0 part 2: 100% of PROV ids verified or struck; struck items removed from persona sheets |
| S0.3 | Dry run: one small room, one cross-cutting room, one luminary visit | FIB and TIM room agents, einstein-time, scribe-day, schema-gate, luckey-mc (9) | position-paper; calibration file (real tokens, wall-clock, failure rate) | G0: dry-run objects 100% schema-valid after one retry; calibration updates the plan's sizing constants |
Day 1: Problems I, the modality rooms
Goal: every family frames its own problems in its own room; luminaries and the defense group visit.
| Session | Title | Who | Output | Gate |
|---|---|---|---|---|
| S1.0 | Day 1 opening: rules, matrix, how to write for the ledger | plenary, 23 attendees (one per room and group) | scribe-digest (opening) | none (soft) |
| S1.1 | Modality rooms: frame the problems (15 rooms) | 44 attendees in 15 rooms, EM-RF to DER (rooms) | position-paper, problem-statement, scribe-digest per room | G1-soft (end of day): all 15 rooms have ≥1 valid problem statement and a digest |
| S1.2 | Luminary walk-rounds: physics heavy hitters visit the rooms | 22 attendees: math, time, adversarial and SVD visitors plus one host per room | position-paper (visit notes) | none (soft) |
| S1.3 | Lightning talks: 15 families, 3 minutes each | plenary, 17 attendees | scribe-digest | none (soft) |
| S1.4 | Defense/ISR briefing panel: how real multi-INT stacks split these problems | 6 defense agents, MC, SEC and one host per room (23) | position-paper, scribe-digest | none (soft) |
| S1.5 | Day 1 close and expert intake | luckey-mc, scribe-day, scribe-ledger, adv-citation-auditor, schema-gate | day digest, expert-request decisions, gate-report | G1-soft report; expert intake decisions |
S1.1 guiding questions: what the family measures in physics terms (conjugate pair, impedance and wave speed, resonance or aperture); which requirement rows are hard and why; what breaks first when this family is fused with others in a ring; which assumptions (timing, calibration, common cause) are unmeasured.
Day 2: Problems II, cross-cutting rooms, crossings, red team
Goal: the cross-cutting rooms (TIME, SVD/ring, systems, math/fields, defense) take over; an analogy session and swap breakouts force crossings; the red team attacks every problem statement; the problem register is frozen at G1.
| Session | Title | Who | Output | Gate |
|---|---|---|---|---|
| S2.0 | Day 2 opening: what Day 1 found, what the cross-cutting rooms must settle | luckey-mc, scribe-day | input-brief | none |
| S2.1 | Cross-cutting rooms: TIME, SVD/ring, SYSTEMS, MATH/fields, DEFENSE (5 parallel rooms) | 25 attendees: TIME 5, SVD 4, SYS 4, MATH 5, DEF 6, SEC 1 | position-paper, problem-statement, scribe-digest per room | none (soft) |
| S2.2 | Analogy session: transducers as antennas, impedance across domains (a Rosetta table) | 15 attendees: seven modality hosts, 4 math, 2 adversarial, SEC, MC | position-paper, scribe-digest (Rosetta table) | none (soft) |
| S2.3 | Swap breakouts: deliberate crossings (5 pairings) | 30 attendees in 5 pairings (see Appendix A) | position-paper (cross-domain links), scribe-digest | none (soft) |
| S2.4 | Red team: attack every problem statement | feynman-critic, four adversarial auditors, def-fieldable-swapc, scribes (8) | scribe-digest; problem-statement (challenged-by filled) | feeds G1 |
| S2.5 | Problem register: dedupe, rank, freeze; expert intake | MC, scribes, schema-gate, one lead per cross-cutting group, feynman-critic (11) | problem-statement (status frozen), gate-report | G1 (human): the owner approves the frozen register |
S2.2 asks the room to fill a table of conjugate pair, characteristic impedance, wave speed, resonance condition and matching layer for EM, airborne acoustic, underwater acoustic, mechanical, electrical and thermal domains, to say where the analogy breaks, and to name one bench test it suggests. The physics background is on the physics and shared space pages.
Day 3: Decide I, convergence
Goal: move from problems to options through hot-cell conferences, option generation by problem cluster and four structured debates.
| Session | Title | Who | Output | Gate |
|---|---|---|---|---|
| S3.0 | Day 3 opening: from problems to options | luckey-mc, scribe-day, scribe-adr | input-brief | none |
| S3.1 | Cell conferences: the 16 hottest cells of the row x column matrix | 16 cells of 3 seats (modality host, cross-cutting lead, adversarial or defense seat); 18 distinct attendees | position-paper, decision-record (draft options) | none (soft) |
| S3.2 | Option generation by problem cluster (6 rooms) | 36 attendees in clusters C1-C6 | decision-record (draft: options only) | none (soft) |
| S3.3 | Debate 1: Does Plato's Key transfer from LLM embeddings to sensor latent spaces? | SVD and math agents, shannon-information, feynman-critic, adv-stats-skeptic, MC, scribe (9) | position-paper, decision-record (draft updated), scribe-digest | none (soft); verdict advisory until G2 |
| S3.4 | Debate 2: Must time be solved before the ring? | einstein-time, time agents, ring agents, adv-stats-skeptic, MC, scribe (9) | same as S3.3 | none (soft); verdict advisory until G2 |
| S3.5 | Debate 3: weftos-metric scope | systems and math agents, gauss-fields-stats, adv-units-auditor, MC, scribe (8) | same as S3.3 | none (soft); verdict advisory until G2 |
| S3.6 | Debate 4 (MC-driven): Fieldable vs elegant | defense, firmware and ring agents, maxwell-fields, newton-mechanics, adv-governance, MC, scribe (10) | same as S3.3 | none (soft); verdict advisory until G2 |
| S3.7 | Day 3 close and expert intake | MC, three scribes, adv-citation-auditor, schema-gate | day digest, gate-report | G2-soft: draft decision-records validate |
The four debates
Each debate has the same shape: the MC reads the motion and the burden of proof; pro and con leads give opening statements; three alternating cross-examination turns per side; one question from each judge; closing statements with one concession each; a judges' verdict with dissent kept; a scribe digest. The plan frames the two positions in the motion itself and does not assign pro and con leads to named agents in advance.
| Debate | Motion | Positions (as framed) | Guiding questions |
|---|---|---|---|
| S3.3 | Does Plato's Key transfer from LLM embeddings to sensor latent spaces? | it transfers / it does not | What would a transfer experiment need (n, controls, null)? Is "rotation plus scale retains ~73%" a hypothesis we can even state for sensors? What does a failed transfer still teach us? |
| S3.4 | Must time be solved before the ring? | lag and sync first / fit them jointly | Is sequential lag-then-fit good enough under pacer gaps? What minimum sync class does each family need before fusion is allowed? |
| S3.5 | weftos-metric scope: ADR-133 lanes or a sibling ADR; MetricSpec for manifolds | a lane of the existing ADR / a sibling ADR | Does Space (circle, torus, product) belong in weftos-metric? Is the field and flux layer a lane of ADR-133 or its own ADR? |
| S3.6 | Fieldable vs elegant: what ships in 90 days on C5/C6/S3 + radar + UWB? | fieldable / elegant | What is the smallest ring that proves something on hardware we own? What does a node cost to field and maintain? Which results would make a customer or a clinic care? |
The ~73% figure in S3.3 is the Plato's Key result as reported for LLM factual-recall key swaps; for sensors it is a hypothesis, not a result (see shared space and ring fusion).
Day 4: Decide II, ranked decisions
Goal: set criteria, score every option, review dissent and reversibility, and pass the human decision gate G2.
| Session | Title | Who | Output | Gate |
|---|---|---|---|---|
| S4.0 | Day 4 opening: criteria and weights | luckey-mc, scribe-adr, scribe-day | input-brief; criteria file | human (async): weights confirmed or edited by the owner |
| S4.1 | Scoring panels: score every option against the criteria | 36 attendees in clusters C1-C6 | decision-record (scores filled: 0-5, one-line rationale, evidence ref, no unscored cell) | none (soft) |
| S4.2 | Decision drafting and dissent review | scribe-adr, adversarial and defense critics, feynman-critic, cluster leads, MC (13) | decision-record (complete, with reversibility class and rollback plan) | feeds G2 |
| S4.3 | Ranking plenary and the human decision gate | MC, three scribes, schema-gate, feynman-critic | decision-record (status), ranked list with one-way doors flagged, gate-report | G2 (human): the owner accepts, edits or rejects each; no central ADR number is claimed |
Accepted decisions stay in the local SYM-ADR namespace; see the decisions page.
Day 5: Solutions I, designs and experiment plans
Goal: turn accepted decisions into solution specs and interfaces, pre-register experiments, and pass the hardware approval gate G3.
| Session | Title | Who | Output | Gate |
|---|---|---|---|---|
| S5.0 | Day 5 opening: accepted decisions become designs | luckey-mc, scribe-day | input-brief | none |
| S5.1 | Design rooms: one per accepted decision cluster | 31 attendees in clusters C1-C4 and C6 | solution-spec (interfaces, data flow, physics basis, acceptance criteria, risks) | none (soft) |
| S5.2 | Interface and schema design: MetricSpec/ModalitySpec, ring-edge fit API, firmware package docs | systems, math and ring agents, adv-units-auditor, MC, scribe (9) | solution-spec (exact types and signatures) | none (soft) |
| S5.3 | Experiment design: pre-register hypotheses, setups and pass/fail | 15 attendees: SVD, time, EM-RF, adversarial and others | experiment-plan (hypothesis, null, setup, pass/fail/inconclusive written before running) | feeds G3 |
| S5.4 | Hardware allocation, safety review and the bench schedule (G3) | sys-firmware-cogs, def-fieldable-swapc, adv-governance, scribe-adr, schema-gate, MC, scribe | experiment-plan (approved flag), bench schedule, gate-report | G3 (human): every hardware step individually approved by the owner; offline-first ordering |
S5.4 rules from the plan: one ESP32 at a time within the USB budget, OTA kept on every node, the SDR is never flashed.
Day 6: Solutions II, replay, bench, verdicts
Goal: run the offline batch first, then only the approved hardware steps, then red-team the results against the pass/fail rules written on Day 5.
| Session | Title | Who | Output | Gate |
|---|---|---|---|---|
| S6.0 | Day 6 opening: run what was approved | luckey-mc, scribe-day | input-brief | none |
| S6.1 | Offline replay and simulation batch | SVD and ring agents, time-lag-tof, emrf-signal, adv-stats-skeptic, gauss-fields-stats, scribe (8) | scribe-digest (results), evidence-ledger-entry (measurement) | none (soft) |
| S6.2 | Bench A: C5 pair: pacer gaps and lag-first fit (approved steps only) | hardware and firmware agents, adv-stats-skeptic, scribe, owner | scribe-digest, evidence-ledger-entry | G3 approvals apply; abort on any deviation |
| S6.3 | Bench B: C6 + MR60BHA2 radar + UWB timing (one board at a time) | EM-RF, acoustic, bio, time and firmware agents, adv-stats-skeptic, scribe, owner | scribe-digest, evidence-ledger-entry | G3 approvals apply; no SDR flashing; one ESP32 at a time |
| S6.4 | Bench C: small ring (3-4 nodes): closure residual and private-part detection | ring and time agents, emrf-hardware, sys-firmware-cogs, adv-stats-skeptic, scribe, owner | scribe-digest, evidence-ledger-entry | G3 approvals apply |
| S6.5 | Results review: red team vs pre-registered pass/fail | feynman-critic, three adversarial auditors, scribe-ledger, scribe-day, MC | scribe-digest, experiment-plan (status: pass, fail or inconclusive) | feeds G4 |
S6.1 asks three offline questions: does streaming SVD hold rank-k fidelity as k shrinks; does lag-first beat joint fitting under injected gaps; do ring closure residuals flag an injected private signal. The plan orders the offline batch across three compute hosts; host names are left out here. The ring terms are defined on the ring fusion page.
Day 7: Solutions III, integration and close
Goal: triage decisions against the results, synthesise the crossings, draft work orders, assemble the final report, sign off G4 and close with a keynote.
| Session | Title | Who | Output | Gate |
|---|---|---|---|---|
| S7.0 | Day 7 opening | luckey-mc, scribe-day | input-brief | none |
| S7.1 | Triage: update decisions from results | 31 attendees in clusters C1-C4 and C6 | decision-record (updated: confirm, supersede or defer, with evidence) | none (soft) |
| S7.2 | Cross-domain synthesis: what the crossings gave us; roadmap and work-order drafts | 15 attendees: MC, SEC, math, time, adversarial, SVD, systems, defense | position-paper, scribe-digest; roadmap, next 10 work orders and grid/site updates as drafts | none (drafts only; no tickets or PRs created) |
| S7.3 | Final report assembly and last red team | scribes, adv-citation-auditor, adv-units-auditor, feynman-critic, schema-gate, MC (8) | final report, final ledger, gate-report | G4: all objects valid; unverified ≤5%; zero claims without evidence; persona claims all carry PROV ids |
| S7.4 | Closing keynote and farewell round | MC, scribe-day, the six luminaries | scribe-digest (keynote) | none |
Appendix A: cross-domain program
A conference where everyone stays in their lane gets good talks and no ideas, so the plan schedules deliberate crossings, each owned by a session.
| Crossing | Where | What we want out |
|---|---|---|
| Acoustics ↔ radar | S2.2, S2.3 | what Doppler, beamforming and matched filtering each can borrow; a shared processing vocabulary |
| Optics ↔ RF | S2.2, S2.3 | coherent vs square-law detection; where E × H flux implies different failure modes |
| Biology/neuro ↔ fusion | S2.3 | does shared low-rank latent structure (sparse or low-dimensional codes) say anything about ring edges? |
| Military ISR ↔ home sensing | S1.4, S2.3, S3.6 | which tower-mesh ideas survive in a room or clinic; what flips on privacy and cost |
| Luminaries ↔ modality experts | S1.2, S2.3, S7.2 | one sentence each side has never heard; withdrawn claims on Day 7 |
| Transducers as antennas; impedance across domains | S2.2 (Rosetta table) | conjugate pair, Z, c, resonance and matching per domain; where the analogy breaks |
| Time ↔ geometry | S3.4 | does solving lag first beat joint fitting? what is the minimum sync class per family? |
- Swap breakouts rotate experts into another family's pack (section 1 and class list only, ≤8k tokens) for one round and require a rebuttal from the home side.
- Sparks (cross-domain sparks in the digests) are collected by the scribe and ranked by the MC at close; the top ones become candidate problems or experiments the next day.
Appendix B: guests and experts on demand
- Request. Any attendee can raise an
expert-request(need, domain, provenance sources) in a position paper or digest. - Decision. The MC approves, rejects or merges the request into an existing agent at the day-close intake (S1.5, S2.5, S3.7, S4.3, S5.4, S6.5), with reasons recorded.
- Build. Approved experts are built overnight from a template with a size-limited context pack; new provenance entries start unverified until the citation auditor checks them.
- Join. An expert joins only the target sessions named in the request, never mid-session.
- Limits. 3 new experts per day, 10 in total, each pack ≤24k tokens.